Concrete sidewalk curb gutter replacement.
Curb and gutter remove replace photos.
The concrete in the gutter is finished with a finishing tool that makes indentations wherever spacers were placed in the curb form.
Excavation gravel base layer compaction or hardscape demolition not included.
This specification covers the material method and installation required by the contractor to repair damaged concrete curbs gutters and sidewalks.
Set forms and reinforcing.
Transverse expansion joints shall be installed at all curb returns and at intervals of approximately 40 feet.
Remove and replace concrete curb and gutter document type noe notice of exemption received 2 20 2020 posted 2 20 2020 project applicant caltrans district 4 document description the purpose of the project is to fix the water ponding caused by the tree root damaging the existing curb and gutter.
Pour and finish concrete.
Remove the spacers and fill those joints with concrete mortar.
This is the responsibility of the homeowner.
Layout finished height and slope.
Where there are sidewalks the town is not responsible for the driveway aprons area between the sidewalk and curb and gutter.
Get the 411 before tackling this curbside project.
This area is treated as a driveway.
The street maintenance division is responsible for the maintenance of 1 143 miles of curb and gutter on city maintained streets.
2 0 scope of work.
The division replaces deteriorated uneven curb and gutter on street reconstruction projects and upon citizen requests.
The contractor shall provide all necessary labor.
Concrete curb and gutter installation labor basic basic labor to install concrete curb and gutter with favorable site conditions.
1 foot of asphalt concrete will be paid for at the contract price per measured.
After the concrete has set remove the front curb board and smoothen the curb and gutter surfaces with the help of special concrete finishing tools.
1 remove and replace sidewalk 25 700 sf 2 remove and replace driveway 9 200 sf 3 remove and replace curb and gutter detail 1 16 type a2 6 or type e 3 220 lf 4 remove park strip improvements 5 300 sf 5 remove median island flat work 100 sf 6 valley gutter 1500 sf 7a depressed curb ramp caltrans type a 17 ea 7b.
A driveway apron is regulated by building codes in most communities so replacing it can be complicated.
Curb and shall extend at least 24 inches beyond the insecure area.
Lightly grade and remove loose soil.
The project is needed in order to ensure that.
Quantities of remove and replace concrete curb and gutter including min.
Curb and gutter removed disposed and replaced and including construction of 1 foot of asphalt concrete 3 inches deep along the installed curb and gutter.